Power Plant Capacity
Lorem ipsum dolor sit amet consectetur. Lacus pellentesque et morbi netus. Leo nulla in dapibus tempor molestie at libero urna.
Cyprus does not have primary energy sources, therefore, Electricity Authority of Cyprus (EAC) relies exclusively on imported fuels, mainly fuel oil, for the production of Electricity. Currently, EAC has three Power Stations with a total installed capacity of 1478 MW as follows:
| Vasiliko Station | |
|---|
| 3 x 130 MW Steam Power Plants | 390 MW |
| 1 x 38 MW Gas Turbine | 38 MW |
| 2 x 220 MW Combined Cycle Units | 440 MW |
| Dhekelia Station | |
|---|
| 6 x 60 MW Steam Power Plants | 360 MW |
| 2 x 50 MW Combined Cycle Units | 100 MW |
| Moni Station | |
|---|
| 4 x 37.5 MW Gas Turbine | 150 MW |
| Total Installed Capacity | 1478 MW |
|---|
EAC has competed in 2026 the construction of Unit No.6 with a capacity of 160 MW at Vasilikos Power Station. The unit is of type combined cycle, and will start commercial operation once Natural Gas becomes available at Vasiliko area for electricity generation purposes. Due to the ongoing delays in Natural Gas arrival, EAC Generation examines temporary operation of Unit No. 6 with Diesel fuel.