Communication
EN
  • EN (English)
  • ΕΛ (Ελληνικά)
Search
Electricity Authority of Cyprus
  • The EAC
    • Our Organization
    • Legislation/Regulations
    • Regulated and Non-Regulated Activities
    • Corporate Information
    • Press, Publicity and Communications Office
    • Mobile App
    • Management System
    • Sustainability
    • Human Resources Department
    • Tenders
    • Personal Data Protection
    Contact Centers
    1818

    For information regarding the electricity bill/account.

    1800

    For faults, pruning, and street lighting.

  • Activities
    Supply
    • Bill payment
    • Receive Your Bill By E-Mail
    • Energy & Appliance Cost Calculator
    • Online Consumption History Statement
    • New Electricity Supply Agreement
    • Special Domestic Tariff 08
    • EAC+ Plan
    • Supply Customer Service Centers
    • Supply Announcements
    • Contact Us
    Distribution
    • Network Users
    • External Partners
    • Sumbit incident
    • Distribution Network Applications
    • Renewable Energy Sources
    • Power Outages / Breakdowns
    • Application tracking
    • Electrical installation inspection
    • Distribution Customer Service Centers
    Generation
    • Wholesale Tariff
    Transmission
    • Existing Transmission System
    • Ten-Year Transmission System Development Programme
    • Compensation procedure for property owners affected by overhead transmission lines
    1818

    For information regarding your electricity bill

    1800

    For damage, pruning and street lighting

  • Non Regulated Activities
Login
  • Generation
  • Power Plant Capacity
  • Renewable Energy Sources (RES)
  • Environmental Issues
  • Electricity Market
  • Contact
The EAC ›
Activities ›
Non Regulated Activities
Communication
EN ›
  • EN (English)
  • ΕΛ (Ελληνικά)
Sign in

  • Generation
  • Power Plant Capacity
  • Renewable Energy Sources (RES)
  • Environmental Issues
  • Electricity Market
  • Contact

Power Plant Capacity

Home / Generation / Power Plant Capacity

​​​Cyprus does not have primary energy sources, therefore, Electricity Authority of Cyprus (EAC) relies exclusively on imported fuels, mainly fuel oil, for the production of Electricity. Currently, EAC has three Power Stations with a total installed capacity of 1478 MW as follows:

Vasiliko Station
3 x 130 MW Steam Power Plants390 MW
1 x 38 MW Gas Turbine38 MW
2 x 220 MW Combined Cycle Units440 MW
Dhekelia Station
6 x 60 MW Steam Power Plants360 MW
2 x 50 MW Combined Cycle Units100 MW
Moni Station
4 x 37.5 MW Gas Turbine150 MW
Total Installed Capacity1478 MW

EAC has competed in 2026 the construction of Unit No.6 with a capacity of 160 MW at Vasilikos Power Station. The unit is of type combined cycle, and will start commercial operation once Natural Gas becomes available at Vasiliko area for electricity generation purposes. Due to the ongoing delays in Natural Gas arrival, EAC Generation examines temporary operation of Unit No. 6 with Diesel fuel.

Vasilikos Power Station

→

Dhekelia Power Station

→

Moni Power Station

→
Electricity Authority of Cyprus
  • fab fa-x
  • fab fa-youtube
  • fab fa-linkedin
  • fab fa-facebook

Service centers

  • Supply
  • Distribution
  • e-charge Service Points

Contact Us

Tel Service - Supply
1818 1818
Tel Service - Distribution
1800 1800

Head offices

​Amfipoleos 11, 2025 Strovolos
P.O. Box 24506, 1399 Nicosia Cyprus

Tel: +357-22 20 10 00


© Electricity Authority of Cyprus 2026

  • Privacy Policy
  • Terms Of Use
  • English
  • Ελληνικά (Greek)
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.