Faults/Interruptions
  • Faults/Scheduled Interruptions
  • Submit an incident
EN
  • EN (English)
  • ΕΛ (Ελληνικά)
Electricity Authority of Cyprus
  • EAC
    • Our Organisation
    • Legislation/Regulations
    • Regulated and non-regulated activities
    • Corporate Information
    • Press, Publicity and Communications Office
    • Mobile App
    • Management system
    • Sustainability
    • Human Resources Department
    • Tenders
    • Personal Data Protection
    Contact Centers
    1818

    For information regarding the electricity bill/account.

    1800

    For faults, pruning, and street lighting.

  • Activities
    Supply
    • My Account
    • Receive Your Bill By E-Mail
    • Energy & Appliance Cost Calculator
    • Online Consumption History Statement
    • New Electricity Supply Agreement
    • Special Domestic Tariff 08
    • EAC+ Plan
    • Supply Customer Service Centers
    • Supply Announcements
    • Contact Us
    1818

    Για πληροφορίες που αφορούν το λογαριασμό ρεύματος

    Distribution
    • Network Users
    • External partners
    • Submit an incident
    • Distribution network applications
    • Renewable Energy Sources
    • Power Outages / Breakdowns
    • Application tracking
    • Electrical installation inspection
    • Distribution Customer Service Centers
    1800

    Για βλάβες, κλαδέματα και οδικό φωτισμό

    Transmission
    • Existing transmission system
    • Ten-Year Transmission System Development Programme
    • Compensation procedure for property owners affected by overhead transmission lines
    Generation
    • Wholesale Tariff
  • Non Regulated Activities
Login
  • Generation
  • Power Plant Capacity
  • Renewable Energy Sources (RES)
  • Environmental Issues
  • Electricity Market
  • Contact
EAC ›
Activities ›
Non Regulated Activities
Contact Us
EN ›
  • EN (English)
  • ΕΛ (Ελληνικά)
Sign in

  • Generation
  • Power Plant Capacity
  • Renewable Energy Sources (RES)
  • Environmental Issues
  • Electricity Market
  • Contact

Vasilikos Power Station

Home / Generation / Power Plant Capacity / Vasilikos Power Station

Vasilikos Power Station is the largest infrastructure project ever undertaken in Cyprus. The importance of this key infrastructure project is intertwined with the broader economic development of Cyprus. The station is a high-tech project and consists of:

  • Three conventional power generation units of 130 MW each using fuel oil, in which anti-pollution technologies systems have been installed to reduce emissions of sulfur dioxide, nitrogen oxides and dust with the aim of reducing these emissions below the limits set by the European Directive on Large Combustion Plants.
  • One 38 MW gas turbine using diesel fuel.
  • Two 220 MW combined cycle units each using diesel fuel and the possibility of converting them to use natural gas as fuel. The EAC has implemented all the necessary modifications to the Vasilikos Units and has proceeded with the installation of all the necessary infrastructure for the combustion of Natural Gas.
  • Unit 6, which is under construction, will be a combined cycle unit with a similar layout as Combined Cycle Units 4 & 5. It is expected to start commercial operation when natural gas becomes available at Vasilikos.

On July 11, 2011, due to the explosion at the naval base in Mari, Vasilikos Power Station, adjacent to the naval base, suffered extensive damage, resulting in the complete suspension of its activities. The station has been restored and is now fully operational.

Vasilikos Power Station produces approximately 66,4% ​​of the total electricity generated by the EAC’s power stations.

The thermal efficiency of the three conventional units for production units is 38% while for the MASK it is approximately 48%. ​​Directive 2012/18/EU of the European Parliament and of the Council of 04/07/2012 on the control of major-accident hazards involving dangerous substances and amending and subsequently repealing Council Directive 96/82/EC requires the operator (EAC- Vasilikos Power Station) to prepare a safety report. Vasilikos Power Station has prepared a safety report in accordance with these European Directives in 2008-2009, which was fully revised in 2019.

The Major Accident Prevention Policy Manual of Vasilikos Power Station presents the EAC’s commitment to prevent large-scale accidents and limit their impact, in order to ensure a high level of protection for humans and the environment.

Safety Report - SEVESO III

→
Electricity Authority of Cyprus

Follow us

  • fab fa-x
  • fab fa-youtube
  • fab fa-instagram
  • fab fa-linkedin
  • fab fa-facebook

Contact Us

Tel Service - Supply
1818 1818
Tel Service - Distribution
1800 1800

Service Centers

  • Supply
  • Distribution
  • e-charge Service Points

Head offices

​Amfipoleos 11, 2025 Strovolos
P.O. Box 24506, 1399 Nicosia
Cyprus

Tel: +357-22 20 10 00


© Electricity Authority of Cyprus 2026

  • Privacy Policy
  • Terms Of Use

Follow us

  • fab fa-x
  • fab fa-youtube
  • fab fa-instagram
  • fab fa-linkedin
  • fab fa-facebook
  • English
  • Ελληνικά (Greek)
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.