Communication
The EAC
Activities
Non Regulated Activities

Back

EAC – Mass Installation of Smart Meters – March 2025

The Electricity Authority of Cyprus announces that as from Saturday 1/03/2025 the mass installation of smart meters will continue in all EAC Regions in the following areas:

Nicosia:          Engomi

                         Metochi Kykkos area on both sides of Metochiou Street

                         Area between Griva Digeni Avenue and Makedonitissis Street and between Griva Digeni Avenue and Kyriakos Matsi Street

Limassol:       Omonia Area, Agios Spyridonas, Provita Area

                         Area between Misiaouli and Kavazoglou Streets and Franklin Roosevelt Streets

Larnaca:        Larnaca Industrial Area

                        Aradippou, from roundabout Rizoelias to the new GSZ roundabout

Paralimni:      Area between Giorki Papadopoulou Street, Protaras Street and Kapparis Avenue

Paphos:         Area between Dimokratias, Ellados and Eleftherios Venizelos Avenues

We remind you that in order to safely replace the meter, the supply will be interrupted for a period of time that is not expected to exceed 20 minutes. The Authority apologizes for any inconvenience. ​

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.