Distribution Network Applications
You can find the necessary documents for the Distribution Network Applications below.
For further information, choose the application you are interested.
For any application regarding Electrical Installation Investigation you will find them listed under «External Partners».
For checking on the progress of your application you may visit the following link
Please note the documents are only available in Greek
The network user fills in the application form “έντυπο παροχής Υπηρεσιών ( Παροχή Νέου/ Επιπρόσθετου Φορτίου και Άλλες Υπηρεσίες)” as well as provide the necessary documentation that is described in the User Instructions on the back of the application.
Detailed instructions can be found on the related content links as well as on the applications.
Any connection process with EACs’ electricity network has to be under the responsibility of an electrician, licensed to operate within Cyprus. The electrician will be responsible to provide the requested documents, among others the necessary documents required.
If the Network is present:
(A) The load is small ( UP to 40A (1-Phase) or 30A (3-Phase) – For normal supply, not storage heating)
-
The application is forwarded to the Installation Inspectors so that a site investigation is carried out or if details are given to prepare the investigation form.
-
If there is no technical problem, the application will be forwarded to the Distribution Network Department for the issue of terms for electricity supply. If there is a technical problem it will be forwarded for preparation of the relevant scheme and then for the issue of terms.
-
After acceptance of terms by the customer and payment of the requisite amount, the licensed electrical contractor of the customer will submit to the Installation. Inspectors, plans for the testing and inspection of the installation.
-
After the inspection and provided that the inspection proved that no repairs were necessary, the customer will come to one of the Customer Service Centers of EAC in order to complete the relevant application card for electricity supply and connection of the service lime by the service installers follows.
(B) The load is large ( greater than 40A (1-Phase) or 30A(3-Phase) or load for storage heating)
-
The application will be forwarded for the relevant scheme to be carried out. If the load is approved them the procedure outlined in paragraph (a) above is followed. If a scheme needs to be prepared then procedure is as per the next paragraph.
If Extension / Reinforcement of network is required:
-
The application will be forwarded for the relevant scheme to be prepared and costing to be carried out.
-
After that it will be forwarded to the Programming Department for the necessary wayleaves and Government approvals (where applicable).
-
The issue of terms by the Distribution Network Department follows. After that the procedure outlined in paragraph (a) above is followed.
(A) The load is small (or up to 40A (1 – Phase) in total or 20A (3-Phase) Additional Load) – except storage heating load
- The
application will be forwarded to the Installation Inspectors so that a site investigation is carried out or if details are given to prepare the investigation form. - If there is no technical problem the application will be forwarded to the Customer Service Department for the issue of terms for electricity supply. If there is a technical problem it will be forwarded for preparation of the relevant scheme and then for the issue of terms.
- After acceptance of terms by the customer and payment of the requisite amount the licensed electrical contractor of the customer will submit to the Installation Inspectors, plans for the testing and the inspection of the installation.
- After the inspection and provided that the inspection proved that no repairs were necessary the customer will come to one of the Customer Service Centres of EAC in order to complete the relevant application card for electricity supply and connection of the additional load will follow.
(B) The load is large ( greater than 40A (1-Phase) or 30A(3-Phase) or load for storage heating)
- The application will be forwarded to the Planning Department for assessment / approval or for carrying out the requisite study.
- If a scheme is necessary, after its completion it will be forwarded to the Programming Department for the necessary wayleaves and Government approvals where necessary. The scheme will then be forwarded for the issue of terms and then the procedure under 2(a) above will be followed.
- If the load is approved without the need of a scheme then the procedure under 2(a) above will be followed.
Simple Cases e.g. resiting of a pole or a stay:
-
The application will be assessed by the Planning Department and will be forwarded to the Construction Department for execution of the work.
All other Cases:
- The application will be forwarded for scheme and costing to be carried out.
- After completion, the scheme will be forwarded to the Programming Department for the requisite way leaves and Government approvals where necessary.
- Issue of terms by the Customer Service Department will follow and then the procedure outlined above.
Below is the documentation regarding switching suppliers
Δ-ΔΔ-679-ΔΙΑΧΕΙΡΗΣΗ ΑΙΤΗΣΗΣ ΑΛΛΑΓΗΣ ΠΡΟΜΗΘΕΥΤΗ.pdf
Ε-ΔΔ-679 – ΑΙΤΗΣΗ ΑΛΛΑΓΗΣ ΠΡΟΜΗΘΕΥΤΗ.pdf
ΕΝΤΥΠΟ ΕΝΗΜΕΡΩΣΗΣ ΛΗΞΗΣ ΣΥΜΒΑΣΗΣ ΠΡΟΜΗΘΕΙΑΣ ΗΛΕΚΤΡΙΚΗΣ ΕΝΕΡΓΕΙΑΣ.pdf
Δ-ΔΔ-900_ΔΙΑΧΕΙΡΙΣΗ ΑΙΤΗΣΗΣ ΤΡΟΠΟΠΟΙΗΣΗΣ ΠΟΣΟΣΤΟΥ ΕΚΠΡΟΣΩΠΗΣΗΣ.pdf
Renewable Energy System (RES) Applications
Renewable Energy System (RES) Applications
You can find the necessary documentation per RES system category below. To review the documents, please select the category you are interested in. Please note the documents are only available in Greek.
| Nicosia – Keryneia – Morfou District Office – RES Applications list with accepted preliminary terms | RES Systems Table Nicosia – Keryneia – Morfou |
| Famagusta – Larnaca District Office – RES Applications list with accepted preliminary terms | RES Systems Table Famagusta – Larnaca |
| Limassol District Office – RES Applications list with accepted preliminary terms | RES Systems Table Limassol |
| Pafos District Office – RES Applications list with accepted preliminary terms | RES Systems Table Pafos |
Further information regarding the application management, the operation and integration of RES power generation systems on EAC’s Distribution and Transmission electrical network can be found in the following documents:
Techinical Guide for RES – Edition 2026
Technical Guide for Storage – Edition 2026
Update – Modifying Technical Guides 2025v2
Update – Receivers for Remote Control of Photovoltaic Systems
Update – Temporary Zero Export
Distribution System Operator requirements for PV Systems 2025
- Έντυπο Παροχής Υπηρεσιών – Άλλες Υπηρεσίες ( Αναθεωρημένο)
- Παράρτημα 1 – Τεχνικός Οδηγός Σύνδεσης Σηστημάτων ΑΠΕ – Έκδοση 2026
- Παράρτημα 2 – Τεχνικός Οδηγός Σύνδεσης Συστημάτων Αποθήκευσης – Έκδοση 2026
- Διαδικασία Σύνδεσης στο Σύστημα Διανομής
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μηχανικού Μελετητή ( Ε-ΔΔ-744)
- Διαδικασία Σύνδεσης ΦΒ Συστημάτων με μέθοδο Net Billing
- Τεχνικός Οδηγός Σύνδεσης Συστημάτων Αποθήκευσης – Έκδοση 2025
- Παράρτημα 1 Τεχνικός Οδηγός Net Billing
- Παράρτημα Α Ειδικοί, Τεχνικοί Όροι Net Billing
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας Net Billing
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Σχέδιο Παραγωγής απο ΑΠΕ για ιδία κατανάλωση
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Διαδικασία Σύνδεσης ΦΒ Συστημάτων με μέθοδο Net Metering_07_04_2023
- Τεχνικός Οδηγός Σύνδεσης Συστημάτων Αποθήκευσης – Έκδοση 2025
- Παράρτημα 1 Τεχνικός Οδηγός
- Παράρτημα Α Ειδικοί, Τεχνικοί Όροι_Σχέδιο ΔΣΔ(ΑΗΚ)_ΣΜ10
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας ΣΜ10
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Σχέδιο Παραγωγής απο ΑΠΕ για ιδία κατανάλωση
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Διαδικασία Σύνδεσης ΦΒ Συστημάτων σε Σχολεία με τη μέθοδο Συμψηφισμού Μετρήσεων
- Παράρτημα 1 Τεχνικός Οδηγός_ΣΜ20_Μάρτιος 2021
- Παράρτημα Α Ειδικοί, Τεχνικοί Όροι_Σχέδιο ΔΣΔ(ΑΗΚ)_ΣΜ20
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας ΣΜ20
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Σχέδιο ΥΕΕΒ Εγκατάσταση ΦΒ Συστημάτων σε Δημόσια Σχολικά Κτήρια
- Διαδικασία Σύνδεσης ΦΒ Συστημάτων με τη μέθοδο Εικονικού Συμψηφισμού Μετρήσεων
- Παράρτημα 1 Τεχνικός Οδηγός ΕΣΜ20_Έκδοση 2023.2
- Παράρτημα Α Ειδικοί Τεχνικοί Όροι_ Σχέδιο ΔΣΔ(ΑΗΚ)_ΕΣΜ20
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας ΕΣΜ20
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Παράδειγμα Αίτησης για Σύνδεση Σημείων Φόρτισης
- Παράρτημα 1 – Διαδικασία Σύνδεσης Υποδομών Επαναφόρτισης
- Παράρτημα 2 – Μετρητής στην εσωτερική εγκατάσταση για διακριτή μέτρηση
- Παράρτημα 3 – Έντυπο Αίτησης – Ενημερώσης για εγκατάσταση – σύνδεση σημείου
- Παράρτημα 4 – Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Σταθμών Επαναφόρτισης
- Τεχνικές Οδηγίες για Εγκατάσταση Υποδομών Φόρτισης
- Διαδικασία Σϋνδεσης ΦΒ Συστημάτων με μέθοδο Virtual Net Billing
- Παράρτημα 1 Τεχνικός Οδηγός Virtual Net Billing
- Παράρτημα Α Ειδικοί, Τεχνικοί Όροι Virtual Net Billing
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας Virtual Net Billing
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Έντυπο Παροχής Υπηρεσιών – Άλλες Υπηρεσίες
- Διαδικασία Σύνδεσης Συστημάτων Παραγωγής ΑΠΕ
- Εμπορικοί Όροι Σχεδίου Π.Ο.Μ.Ρ.Α.Η
- Τεχνικός Οδηγός Σ.Α.Α.Η
- Παράρτημα Α Ειδικοί, Τεχνικοί Όροι
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας Σχεδίου
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Σχέδιο ΑΠΕ στο Πλαίσιο της Μεταβατικής Ρύθμισης της Αγοράς Ηλεκτρισμού
- Έντυπο Τελικής Προσφοράς (Όρων) Σύνδεσης ΣΜΡΑΗ
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Έντυπο Παροχής Υπηρεσιών – Άλλες Υπηρεσίες
- Διαδικασία Σύνδεσης Συστημάτων Παραγωγής ΑΠΕ
- Εμπορικοί Όροι Σχεδίου Σ.Α.Α.Η
- Τεχνικός Οδηγός Σ.Α.Α.Η
- Παράρτημα Α Ειδικοί, Τεχνικοί Όροι Σχεδίου Σ.Α.Α.Η
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας Σχεδίου Σ.Α.Α.Η
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Έντυπο Παροχής Υπηρεσιών – Άλλες Υπηρεσίες
- Διαδικασία Σύνδεσης Συστημάτων Παραγωγής ΑΠΕ εκτός Σχεδίου Σύνδεσης
- Προκαταρτικοί Όροι Σύνδεσης Εκτός Σχεδίου Στήριξης
- Έντυπο Τελικών Όρων Εκτός Σχεδίου Στήριξης
- Τεχνικός Οδηγός Σ.Α.Α.Η
- Παράρτημα Α Ειδικοί Τεχνικοί Όροι Σχέδιο ΔΣΔ-Σ.Α.Α.Η
- Παράρτημα Χ Γενικοί Όροι Σύνδεσης και Λειτουργίας
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Έντυπο Παροχής Υπηρεσιών – Άλλες Υπηρεσίες
- Παράρτημα 1 – Τεχνικός Οδηγός Σύνδεσης Συστημάτων ΑΠΕ – Έκδοση 2026
- Διαδικασία Σύνδεσης στο Σύστημα Διανομής
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων ΦΒ Συστημάτων
- Πίνακας Κατασκευαστικών και Λειτουργικών Παραμέτρων Συστημάτων Αποθήκευσης
- Υπεύθυνη Δήλωση Ηλεκτρολόγου Μελετητή (Ε-ΔΔ-744)
- Παράρτημα “Α-2” – Ειδικοί, Τεχνικοί και άλλοι Όροι
- Παράρτημα “Χ-2” – Γενικοί Όροι Σύνδεσης και Λειτουργίας
- Παράρτημα 2 – Τεχνικός Οδηγός Σύνδεσης Συστημάτων Αποθήκευσης – Έκδοση 2026