Forward planning for the establishment/upgrading of Substations, Overhead and Underground Transmission Network (including licensing, environmental studies, with government services and local authorities, expropriations etc)
Transmission System Studies ((load flow, short circuit, stability, substation earthing, motor starts etc.)
Reliability Studies of the Transmission Network
Preparation of the 10 Year Transmission Development Program in cooperation with the TSOC
Load Forecasting
Preparation of the Transmission Costing Manual
Coordination for the preparation of the yearly Budget of the Transmission
Participation in the preparation of Terms of Connection to the EAC Network for customers demanding load greater than 8MW and less than 12MW