Faults/Interruptions
  • Faults/Scheduled Interruptions
  • Submit an incident
EN
  • EN (English)
  • ΕΛ (Ελληνικά)
Electricity Authority of Cyprus
  • EAC
    • Our Organisation
    • Legislation/Regulations
    • Regulated and non-regulated activities
    • Corporate Information
    • Press, Publicity and Communications Office
    • Mobile App
    • Management system
    • Sustainability
    • Human Resources Department
    • Tenders
    • Personal Data Protection
    Contact Centers
    1818

    For information regarding the electricity bill/account.

    1800

    For faults, pruning, and street lighting.

  • Activities
    Supply
    • My Account
    • Receive Your Bill By E-Mail
    • Energy & Appliance Cost Calculator
    • Online Consumption History Statement
    • New Electricity Supply Agreement
    • Special Domestic Tariff 08
    • EAC+ Plan
    • Supply Customer Service Centers
    • Supply Announcements
    • Contact Us
    1818

    Για πληροφορίες που αφορούν το λογαριασμό ρεύματος

    Distribution
    • Network Users
    • External partners
    • Submit an incident
    • Distribution network applications
    • Renewable Energy Sources
    • Power Outages / Breakdowns
    • Application tracking
    • Electrical installation inspection
    • Distribution Customer Service Centers
    1800

    Για βλάβες, κλαδέματα και οδικό φωτισμό

    Transmission
    • Existing transmission system
    • Ten-Year Transmission System Development Programme
    • Compensation procedure for property owners affected by overhead transmission lines
    Generation
    • Wholesale Tariff
  • Non Regulated Activities
Login
EAC ›
Activities ›
Non Regulated Activities
Contact Us
EN ›
  • EN (English)
  • ΕΛ (Ελληνικά)
Sign in

Upgrading of Transmission Substations “Papacostas” and “Ipsonas”, and the establishment of a new primary substation “Limassol New Port”

Home / Co-funded projects / Co‑funded Cohesion Policy Projects 2021–2027 / Upgrading of Transmission Substations “Papacostas” and “Ipsonas”, and the establishment of a new primary substation “Limassol New Port”

The EAC transmission system is facing various challenges concerning:

Changes in the operation of the electricity grid (increasing needs for traceability and control of electricity flow as a result of the increasing use of RES),

Increased need for green energy penetration in the transmission and distribution system; and

Changes in technologies (increasing needs for increased grid capacity due to the use of RES and electrification of energy).

In order to keep up with the current challenges and trends, EAC is undertaking a gradual upgrade of transmission substations that will allow for a significant increase in power flow, greater safety and reliability, as well as the integration of RES installations and other new technologies, such as energy storage.

This project concerns upgrades of Transmission Substations “Papacostas” and “Ipsonas”, and the establishment of a new primary substation “Limassol New Port”

Budget of the project Upgrading of Transmission Substations “Papacostas” and “Ipsonas”, and the establishment of a new primary substation “Limassol New Port”: €15,522,116.50

The project is co-funded by the EU within the framework of the Cohesion Policy Programme “THALIA 2021-2027″.​

Electricity Authority of Cyprus

Follow us

  • fab fa-x
  • fab fa-youtube
  • fab fa-instagram
  • fab fa-linkedin
  • fab fa-facebook

Contact Us

Tel Service - Supply
1818 1818
Tel Service - Distribution
1800 1800

Service Centers

  • Supply
  • Distribution
  • e-charge Service Points

Head offices

​Amfipoleos 11, 2025 Strovolos
P.O. Box 24506, 1399 Nicosia
Cyprus

Tel: +357-22 20 10 00


© Electricity Authority of Cyprus 2026

  • Privacy Policy
  • Terms Of Use

Follow us

  • fab fa-x
  • fab fa-youtube
  • fab fa-instagram
  • fab fa-linkedin
  • fab fa-facebook
  • English
  • Ελληνικά (Greek)
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.