Communication
EN
  • EN (English)
  • ΕΛ (Ελληνικά)
Search
Electricity Authority of Cyprus
  • The EAC
    • Our Organization
    • Legislation/Regulations
    • Regulated and Non-Regulated Activities
    • Corporate Information
    • Press, Publicity and Communications Office
    • Mobile App
    • Management System
    • Sustainability
    • Human Resources Department
    • Tenders
    • Personal Data Protection
    Contact Centers
    1818

    For information regarding the electricity bill/account.

    1800

    For faults, pruning, and street lighting.

  • Activities
    Supply
    • Bill payment
    • Receive Your Bill By E-Mail
    • Energy & Appliance Cost Calculator
    • Online Consumption History Statement
    • New Electricity Supply Agreement
    • Special Domestic Tariff 08
    • EAC+ Plan
    • Supply Customer Service Centers
    • Supply Announcements
    • Contact Us
    Distribution
    • Network Users
    • External Partners
    • Sumbit incident
    • Distribution Network Applications
    • Renewable Energy Sources
    • Power Outages / Breakdowns
    • Application tracking
    • Electrical installation inspection
    • Distribution Customer Service Centers
    Generation
    • Wholesale Tariff
    Transmission
    • Existing Transmission System
    • Ten-Year Transmission System Development Programme
    • Compensation procedure for property owners affected by overhead transmission lines
    1818

    For information regarding your electricity bill

    1800

    For damage, pruning and street lighting

  • Non Regulated Activities
Login
The EAC ›
Activities ›
Non Regulated Activities
Communication
EN ›
  • EN (English)
  • ΕΛ (Ελληνικά)
Sign in

Automation of the Distribution System and Installation of SCADA/ADMS System

Home / Co Funded Projects / Co‑funded Cohesion Policy Projects 2021–2027 / Automation of the Distribution System and Installation of SCADA/ADMS System

 

The penetration of Renewable Energy Sources (RES) has increased significantly in recent years and has brought significant challenges to Distribution Networks as their development over time cannot support the maximization of this penetration. To make this possible, an overhaul of the Distribution Grid and a transformation of the way the system operates is required.

The actions of the project entitled “Automation of the Distribution System and Installation of SCADA/ADMS (Supervisory Control and Data Acquisition / Advanced Distribution Management System) will transform the Distribution Network into an active and intelligent system. The project will enable the required real-time observability, control, and flexibility to enable the networks to not just connect but integrate users, and green energy to flow seamlessly.

The following results/deliverables are expected from the implementation of the project:

  • Modernization of the Medium and Low Voltage Networks with the installation of the new switching and switchgear equipment to be installed at AEC’s distribution substations for the purpose of information gathering.

  • Development of a complete infrastructure for the ESDS, i.e. regional equipment and new IT infrastructure for the SCADA/ADMS system

  • Full operation of the ESMS on a 24×7 basis (The operation of the ESMS is not co-financed)

  • Installation of the tools/applications for the operational management of the Distribution System, the smooth operation of the Competitive Electricity Market, the integration of RES in the Distribution System, and the interconnection of the system with the other information platforms of the AHK system.

Budget of the project: 27,000,000 €

 

The project is co-funded by the EU within the framework of the Cohesion Policy Programme “THALIA 2021-2027″.​

 

​

Electricity Authority of Cyprus
  • fab fa-x
  • fab fa-youtube
  • fab fa-linkedin
  • fab fa-facebook

Service centers

  • Supply
  • Distribution
  • e-charge Service Points

Contact Us

Tel Service - Supply
1818 1818
Tel Service - Distribution
1800 1800

Head offices

​Amfipoleos 11, 2025 Strovolos
P.O. Box 24506, 1399 Nicosia Cyprus

Tel: +357-22 20 10 00